Bryant BW3 Betriebsanleitung Seite 1

Stöbern Sie online oder laden Sie Betriebsanleitung nach Warmwasserbereiter & Kessel Bryant BW3 herunter. Bryant BW3 Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
NOTE: Read the entire instruction manual before starting the installation. These instructions must be affixed on or adjacent to the boiler.
Index Page
SAFETY CONSIDERATIONS.....................................................................................................................................................................................2
BOILER RATINGS AND CAPACITIES ....................................................................................................................................................................3
INTRODUCTION ......................................................................................................................................................................................................3-4
LOCATING THE BOILER.......................................................................................................................................................................................4-5
FRESH AIR FOR COMBUSTION...........................................................................................................................................................................5-6
Boiler Located in Unconfined Space.......................................................................................................................................................................5
Boiler Located in Confined Space .......................................................................................................................................................................5-6
INSTALLATION—SYSTEM PIPING .....................................................................................................................................................................6-7
For Use with Cooling Units.....................................................................................................................................................................................7
Low Design Water Temperature Systems (Below 140°F) .....................................................................................................................................7
CHIMNEY AND VENT PIPE CONNECTION.......................................................................................................................................................7-9
Checking Chimney................................................................................................................................................................................................7-8
Minimum Vent Pipe Clearance ............................................................................................................................................................................8-9
Removing Existing Boiler from Common Venting System...................................................................................................................................9
®
CANADIAN GAS ASSOCIATION
APPROVED
R
ama
ASME
®
A89453
MODEL BW3
Installation, Start-Up, and Operating Instructions
BW3
Gas-Fired
Induced-Draft Hot Water Boilers
Sizes 42,500 thru 225,000
Series A
Form: IM-BW3A-02 Cancels: IM-BW3A-01 Printed in U.S.A. 8-95 Catalog No. 92-33BW-3A2
Seitenansicht 0
1 2 3 4 5 6 ... 23 24

Inhaltsverzeichnis

Seite 1 - Series A

NOTE: Read the entire instruction manual before starting the installation. These instructions must be affixed on or adjacent to the boiler.Index PageS

Seite 2

The boiler must be isolated from gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gassupply

Seite 3

Fig. 10—Unit Wiring DiagramNOTE: If any of the original wire as supplied with this appliance must be replaced, it must be replaced with type 105°C the

Seite 4

SEQUENCE OF OPERATION1. Thermostat calls for heat, powering 1K relay coil and closing contacts 1K1 and 1K2.2. Circulator pump is powered through termi

Seite 5

PROCEDURE 7—DRAIN VALVEThis manual valve provides a means of draining all water from boiler and system. It is often installed in the 3/4-in. tapping a

Seite 6

FOR YOUR SAFETY READ BEFORE OPERATINGWARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage,

Seite 7

10. After visually inspecting flame, replace lower front panel.WARNING: If appliance will not operate after several tries, turn gas control knob to OF

Seite 8

PROCEDURE 6—SAFETY CONTROLS CHECKAfter setting limit control to desired setting, check to see if it shuts off gas supply to burners. Turn thermostat t

Seite 9 - * Outside diameter

PROCEDURE 7—CLEANING BOILER AND BURNERSFlue passages between sections should be examined yearly and cleaned if necessary. To clean:1. Remove burners,

Seite 10

SERVICE HINTSYou may avoid inconvenience and service calls by checking these points before you call for service.FOR YOUR SAFETYWHAT TO DO IF YOU SMELL

Seite 11 - Fig. 10—Unit Wiring Diagram

REPAIR PARTSIMPORTANT — READ THESE INSTRUCTIONS BEFORE ORDERINGAll parts listed in the following Parts List may be ordered through your nearest suppli

Seite 12

GAS SUPPLY PIPING ...

Seite 13

REPAIR PARTSPropane Gas Burners and Manifold PartsThis is a Repair Parts List—Not a Packing ListKEYNO.DESCRIPTIONPART NO.2 Section 3 Section 4 Section

Seite 14 - IN "ON" POSITION

REPAIR PARTSJacket—Section and Base PartsThis is a Repair Parts List—Not a Packing ListKEYNO.DESCRIPTIONPART NO.2 Section 3 Section 4 Section 5 Sectio

Seite 15 - Standing Radiators 180°F

REPAIR PARTSKEY NO. DESCRIPTION PART NO.1 3/4-in. ASME Relief Valve 146-22-0112 3/4-in. X 5-1/2-in. Nipple 146-07-0403 Temperature-Pressure Gage 146-2

Seite 16 - OUTER CONE DARKER BLUE

SERVICE TRAININGPackaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, includin

Seite 17

© 1995 CAC / BDP P.O. Box 70, Indianapolis, IN 46206 imbw3a02—24—Catalog No. 92-33BW-3A2

Seite 18 - FOR YOUR SAFETY

BOILER RATINGS AND CAPACITIESThe ratings marked "Net I=B=R Rating" indicate the amount of radiation each boiler will take care of under norm

Seite 19 - REPAIR PARTS

Where required by authority having jurisdiction, the installation must conform to American Society of Mechanical Engineers Safety Code forControls and

Seite 20

7. The floor supporting boiler must be non-combustible. If it is combustible, place the boiler on a factory-approved combustible floor base.We use a 2

Seite 21

INSTALLATION—SYSTEM PIPING1. Place boiler in selected location (as near chimney as possible). Boiler is shipped assembled. Only the relief valve with

Seite 22

A hot water boiler installed above radiation level must be equipped with a low water cut-off device. A periodic inspection is necessary as is flushing

Seite 23 - SERVICE TRAINING

a. listed Type B vent pipeb. listed flexible vent linerc. poured ceramic liner5. Outside chimneys should not be used unless they are either:a. enclose

Seite 24 - Catalog No. 92-33BW-3A2

A new Type B gas vent or flexible liner must be installed in accordance with instructions furnished with vent. Maintain clearances as specifiedfor ven

Kommentare zu diesen Handbüchern

Keine Kommentare