VERTICAL INSTALLATION
Sound Attenuation for Vertical Units
Sound attenuation is achieved by enclosing the unit
within a small mechanical room or a closet. Additional
measures for sound control include the following:
1. Mount the unit so that the return air inlet is 90° to
the return air grille. Refer to Figure 9. Install a sound
baf e as illustrated to reduce line-of sight sound
transmitted through return air grilles.
2.
Mount the unit on a rubber or neoprene isolation pad to
minimize vibration transmission to the building structure.
Isolation Pad
Insulated Sound Baffle
(Open Both Ends and Bottom)
Return Air Louver or Grille
Figure 9: Vertical Sound Attenuation
Condensate Piping – Vertical Units
Vertical units utilize a condensate hose inside the
cabinet as a trapping loop; therefore an external trap
is not necessary. Figure 10a shows typical condensate
connections. Figure 10b illustrates the internal trap for a
typical vertical heat pump. Each unit must be installed with
its own individual vent (where necessary) and a means to
ush or blow out the condensate drain line. Do not install
units with a common trap and/or vent.
Vent
*3/4" [19.1mm] IPT
3/4" [19.1mm] PVC
Alternate
Condensate
Location
Water
Connections
(10mm per 46cm)
* Some units include a painted drain connection. Using a
threaded pipe or similar device to clear any excess paint
accumulated inside this fitting may ease final drain line installation.
Figure 10a: Vertical Condensate Drain
Figure 10b: Vertical Internal Condensate Trap